Drilling & Production Technology ›› 2022, Vol. 45 ›› Issue (6): 36-41.

• DRILLING TECHNOLOGY • Previous Articles     Next Articles

Optimization Technology and Application of Casing Program of Ultra-deep Wells in Fuman Oilfield

SONG Zhoucheng1 , ZHAI Wenbao2, DENG Changsong1 , XU Yang3, XU Ximing1 , WANG Xin1 , WEN Tao1   

  1. 1 . PetroChina Tarim Oilfield Company, Korla, Xijiang 841000, China; 2. CNPC Engineering Technology R&D Co. ,LTD. , Beijing 102206, China; 3 . Xinjiang Branch, CNPC Chuanqing Engineering Co. , LTD. , Korla, Xijiang 841000, China
  • Online:2022-11-25 Published:2022-11-30

富满油田超深井井身结构优化技术与应用

宋周成,翟文宝,邓昌松,徐杨,徐席明,汪鑫,文涛   

  1. 1中国石油塔里木油田公司  2中国石油集团工程技术研究院有限公司  3中国石油川庆钻探公司工程有限公司新疆分公司
  • 作者简介:宋周成(1966-),正高级工程师,塔里木油田公司总经理助理,1989年毕业于江汉石油学院,主要从事钻井技术研究与生产管理等工作。地址:(841000) 新疆库尔勒市塔里木油田公司油气田产能建设事业部,电话:13709966167, E-mail: dcs023 @ 163 . com
  • 基金资助:
    中国石油油气和新能源公司钻井课题“塔里木盆地风险勘探领域和目标研究、工程技术攻关及现场试验” 子课题“ 塔里木台盆区超深井及风险探井钻完井技术研究”( 编号:2022KT0506) 资助。

Abstract: With the development of exploration in Fuman Oilfield, the complexity of drilling accidents is understood more in-depth. The three spudded in structure of Tarim standard Ⅲ and four spudded in structure of Tarim standardⅠadopted inthe early stage can not meet the requirements of safe drilling and economic and efficient development. In the activity of improve the quality and performance, the shortcomings of the existing casing programs were analyzed, and the contradiction of the running depth limit of 200. 03 mm casing in the second spudded in section of Tarim standardⅢ, and the 244. 50 mm casing strength in the second spudded in section of Tarim standardⅠ, and the rig resources was optimally solved. The casing programs of the more than 8 000 meters well was expanded, and three sets of casing program design schemes were formed. After 10 months of investigation on the casing programs optimization, the production efficiency has been increased by 4. 08% , the accident complexity rate has been reduced by 3 . 26% , and the drilling time has been shortened by 25 days on average, which realized the purpose of improving the operation efficiency and reducing the operation cost.

Key words: Tarim Basin, Fuman Oilfield, ultra-deep wells, casing program, casing strength check

摘要: 随着富满油田勘探开发的推进,对钻井事故复杂的认识更深入, 前期采用的塔标Ⅲ 三开和塔标Ⅰ四开井身结构难以满足安全钻井和高效开发的需要。 在提质增效活动中, 分析了现有井身结构存在的不足,优化解决了塔标Ⅲ二开 Ø200. 03 mm套管下深极限和塔标Ⅰ 二开 Ø244. 50 mm 套管强度、钻机资源矛盾,拓展了超8 000 m井深的井身结构,形成了三套井身结构设计方案。通过对优化后井身结构进行10个月的跟踪调查,生产时效提高了4.08% 、事故复杂率降低了3.26%,钻井周期平均缩短了25 d,实现了提升作业效率、降低作业成本的目的

关键词: 塔里木盆地, 富满油田, 超深井, 井身结构, 套管强度校核